Difference between
version 21
and
version 19:
Line 2 was replaced by lines 2-3 |
- [Notes from KU Group May-Sept 2005 work | KUTaxonUpdate_Sept2005] |
+ [Notes from KU Group May-Sept 2005 work | KUTaxonUpdate_Sept2005]\\ |
+ [Notes from Napier Group May-Sept 2005 work | NUTaxonUpdate_Sept2005] |
Line 34 was replaced by line 35 |
- * Planning and prioritization: we need to dedicate a session at San Diego to outlining a complete workflow involving concept application including concept mapping, concept markup, the Kepler interface (and whatever related steps and services are needed), and various roles and responsibilities in a SEEK-enabled world . How are the tools meant to interact to provide the desired services for taxonomists and ecologist users? This step is necessary at this point to assure we build allthe necessary user administrative functions for a prototype system to function. |
+ * Planning and prioritization: we need to dedicate a session at San Diego to outlining a complete workflow involving concept application including concept mapping, concept markup, the Kepler interface (and whatever related steps and services are needed), and various roles and responsibilities in a SEEK-enabled world. How are the tools meant to interact to provide the desired services for taxonomists and ecologist users? This step is necessary at this point to assure we build all the necessary user administrative functions for a prototype system to function. |
Back to Taxon WG Conference Call_30 Sept 2005,
or to the Page History.
|