Line 1 was replaced by line 1 |
- JANUAY 30, 2006 |
+ !JANUARY 30, 2006 SEEK Taxon Meeting, Nescent, Durham, NC |
Line 3 was replaced by line 3 |
- SEEK Taxon Meeting, Nescent, Durham, NC |
+ !! Monday Morning |
At line 4 added 1 line. |
+ ;Kepler Status:target user definition, no taxon specific topics at next meeting. will discuss API for Kepler to make integration easier. Look at future Kepler (non-SEEK) proposals. Bridge different ITRs. Target audience for Kepler will probably expand dramatically. Laura thinks Kepler user is domain scientist __combined__ with a programmer. |
Lines 6-8 were replaced by line 7 |
- Monday |
- -------- |
- !! Morning |
+ ;Kepler Actor: ENM workflow. Given a name, authority, return set of all names at specific rank below that. That list is then used to expand Digir query. Currently stubbed in - hardcodes and canned response, no TOS interaction. Just need to add 2 soap calls, then ready for ENM. Probably should have some interaction in 2 places: 1)allow to choose which concept to be root before traversing down to rank; 2) allow user to decide how to handle overlaps - selectively remove?. |
Line 10 was replaced by line 9 |
- ;Kepler Status:target user definition, no taxon specific |
+ ;:Similarities between Taxon and SMS. Same thing, but basically all done with database in Taxon. May Meeting - Taxon hash out decisions on our interactivity needs, then present to larger group |
Line 12 was replaced by line 11 |
- ;Summary of Taxon Visualization Evaluation: January 23 of Martin's viz tool |
+ ;:Check with Deana about use case for Biodiversity |
Line 14 was replaced by lines 13-14 |
- ;ConceptMapper Demo, React (10-12): |
+ ;ConceptMapper Demo, React (10-12): import from __either__ TCS __or__ 3 tab delimited/csv files with specific fields. |
+ |
Lines 23-41 were replaced by line 23 |
- |
- |
- Afternoon |
- |
- |
- |
- 12 Lunch for five people |
- |
- |
- |
- 1-3:30 Taxon Tool Evaluation, Split into two rooms: |
- |
- |
- |
- 3:30-4:30 session with Laura |
- |
- |
- |
- Kepler |
+ !! Monday Afternoon |
Line 43 was replaced by line 25 |
- EML Revisions |
+ ;1-3.30 Taxon Tool Evaluation, Split into two rooms: |
Line 45 was replaced by lines 27-29 |
- Rob’s stub actor |
+ ;3.30-4.30 Summary of Taxon Visualization Evaluation: January 23 of Martin's viz tool |
+ See Laura's report in cvs at: |
+ Ecologists much more positive. Collection managers might benefit more from small plugin to Specify instead. Both groups really wanted some geographic functions integrated. |
Line 47 was replaced by line 31 |
- Morpho |
+ ;GUIDS:What gets a guid? Specimens - should go on biological object, not multiple treatments, preparations, etc. Possibly versions for different collection objects connected to same biological object. |
Line 49 was replaced by line 33 |
- Review of Project Integration |
+ ;Kepler: |
Line 51 was replaced by line 35 |
- |
+ ;EML Revisions: |
Line 53 was replaced by line 37 |
- Tuesday |
+ ;Rob’s stub actor: |
Line 55 was replaced by line 39 |
- |
+ ;Morpho: |
Line 57 was replaced by line 41 |
- Updates |
+ ;Review of Project Integration: |
Line 59 was replaced by line 43 |
- GUIDS |
+ !! Tuesday morning |
Line 61 was replaced by line 45 |
- Remaining Issues |
+ ;GUIDS: See Jessie's powerpoint |
Line 63 was replaced by line 47 |
- |
+ ;Kepler: After stable, Taxon group play with Taxon actor. Non-interactive version. |
Line 65 was replaced by lines 49-54 |
- |
+ ;Remaining Issues: ESA (August 7-11) - will probably do something for booth |
+ ;:Wed, 22 Feb 2006 (16:00 GMT) Taxon call - paper topics |
+ ;:15 march 2006 (16:00 GMT) Taxon call |
+ ;:18 April 2006 (16:00 GMT) Taxon call |
+ ;: SEEK May meeting - 30 April - 5 May |
+ ;:Data - will put MSW 1993 and 2005 into TOS, and ConceptMapper, then someone (Nico?) will map between them. |
Removed line 67 |
- |